top of page

Blog Posts

WEEKLY DIGEST - 20.11.2017


WEEKLY DIGEST

Advanced Engineers Stuff

 

Factory and Site Acceptance Tests (FAT, SAT) For Electrical and Automation Systems In a Power Plant

The thesis consists of an investigation of what is to be tested with FAT (Factory Acceptance Test) and SAT (Site Acceptance Test), and also how to do the testing. The result of this investigation is a basic template of how these documents can be designed. Factory Acceptance Tests are done at the factory to make sure that certain requirements are met, which results in high quality products.



Factory and Site Acceptance Tests (FAT, SAT) For Electrical and Automation Systems In a Power Plant (photo credit: Edvard Csanyi)

Electric motors – Energy efficiency reference guide for novice & experienced users [Download Guide]

Control Panel Technical Design Guide (EMC Protection and Panel Wiring Tips) [Download Guide]

Learn to operate MV Indoor/Outdoor Switchgears (Schneider, ABB, Siemens and others) [Download Guide]

Adjustable speed drive motor protection applications and issues [Download Guide]

Implementation of IEC 61850 in power substation environment [Download Guide]

 

  • Beyaz LinkedIn Simge
  • Beyaz Facebook Simge
  • Beyaz Heyecan Simge

BU İÇERİĞE EMOJİ İLE TEPKİ VER

bottom of page